11.4 - INSTALLATION
Make sure that the crane is switched off during the assembly operation. Clear the
work area and use security clothing.
Check the power supply and disconnect the power supply to the crane.
Do not forget to connect the earth cable.
Use flame resistant cables for the connections.
Find a suitable place for the installation of the infrared transmitter, away from elements,
which could generate intense electrical disturbances and obstacles to the transmission of
light.
Choose the correct power supply and connect it.
Fit the jumper selector in master position.
Select the code programmed in the EEPROM memory of the transmitter.